PROJECT LIST

  • Client
  • Project name
  • Scope of Work
  • Duration
  • JML - JEL Maintenance Ple Ltd
    ERECTION, MODIFICATION AND DISMANTLE
    OCT 2020 - FEB 2021
  • PEC- PLANT ENGINEERING CONSTRUCTION PTE LTD
    LGS PROJECT

    ERECTION, MODIFICATION AND DISMANTLE

    SEP 2020 - MAR 2021
  • Pfizer Asia Pacific Pte Ltd
    2020-Runners (Caustic)

    Piping works and equipment installation

    Ongoing
  • Pfizer Asia Pacific Pte Ltd
    RFQ for runners

    Piping works and equipment installation

    Aug 2020 - On-going
  • Shinryo Singapore Pte Ltd
    SMRT stations A & A upgrade

    A & A works for electrical systems on existing set-up.

    May 2020 - date (On-going)
  • ROTARY ENGINEERING PTE LTD
    PIPE RACK

    ERECTION, MODIFICATION AND DISMANTLE

    JUL 2020 - JAN 2021
  • SANKYU (Singapore) Pte Ltd
    SHUT DOWN and MAINTENANCE

    ZEON,SMAG and MPS

    JAN 2020 - DEC 2020
  • MPS SDM 2020

    Piping works, lifting works and equipment installation

    Feb 2020 - Apr 2020
  • Pfizer Asia Pacific Pte Ltd
    Ceiling frame installation at walkway

    Civil works and structure works

    Feb 2020 - Mar 2020
  • Novabay Pte Ltd
    RFQ Centrifuge works

    Design, fabrication, installation and lifting works

    Feb -2020