PROJECT LIST

  • Client
  • Project name
  • Scope of Work
  • Duration
  • SWTE (Senoko waste-to- energy plant)

    Sub-Contract of Manpower (Electrical & Insulation)

    Jul 2019 - Jun 2021
  • Puretech Engineering Pte Ltd
    Construction of GRAB HQ

    Sub contract of HT cable termination and Hi-pot testing works

    Jun 2019 - On-going
  • Aventis Pharma Manufacturing Pte Ltd (Sanofi)
    Air Filtration kit in SCP and Enox plant

    Piping works and equipment installation works

    Jun-2019
  • Seraya incineration U-bend replacement

    Chute design, fabrication and installation works.

    May 2019 - Jun 2019
  • Pfizer Asia Pacific Pte Ltd
    2019-QC Lab Effluent Discharge Modification

    Piping works and Equipment installation

    May 2019 - June 2019
  • Aventis Pharma Manufacturing Pte Ltd (Sanofi)
    RFQ BCP project Utility tie-ins

    Design, fabricate, installation works and lifting works.

    Apr 2019 - May 2019
  • Puretech Engineering Pte Ltd
    Yunan Garden upgrading project

    Cable termination and cable joining for HT system, Professional Engineering (LEW) endorsement and consultancy services

    Apr 2019 - May 2019
  • Aventis Pharma Manufacturing Pte Ltd (Sanofi)
    Stability chamber project

    Civil works and piping modification

    Mar 2019
  • Abbvie Opertations Pte Ltd
    API level 1 filtration manifold modification and repair works

    Piping works and lifting works

    Mar 2019
  • Abbvie Opertations Pte Ltd
    Refurbish of flooring, wall and ceiling for API building

    Civil works and Lifting works

    Feb 2019 - Mar 2019