{"id":380,"date":"2021-11-19T13:57:05","date_gmt":"2021-11-19T05:57:05","guid":{"rendered":"https:\/\/miradorbcpl.com\/news\/?p=380"},"modified":"2021-11-19T22:15:32","modified_gmt":"2021-11-19T14:15:32","slug":"iso-14001environmental-management-systems-certification","status":"publish","type":"post","link":"https:\/\/miradorbcpl.com\/news\/380","title":{"rendered":"ISO 14001:2015 (Environmental Management Systems Certification)"},"content":{"rendered":"<p><strong><u>ISO 14001:2015 \u2013 Environmental Management Systems Certification<\/u><\/strong><\/p>\n<p>Global environmental issues have always been one of the major concerns for mankind. Some of these environmental issues have worsened with time, and have shown great impact on human. Examples of some environmental issues include:<br \/>\n\u2022\u00a0 Global warming;<br \/>\n\u2022\u00a0 Air pollution;<br \/>\n\u2022\u00a0 Water pollution;<br \/>\n\u2022\u00a0 Unsustainable waste generation;<br \/>\n\u2022\u00a0 Climate change.<\/p>\n<p>As an organisation, Mirador Building Contractor Pte Ltd hopes to carry out our business in a responsible manner, with minimum impact on the environment. In order to show the company\u2019s commitment, an environmental management system was adopted into the company\u2019s business. Since then, the company has introduced procedures to manage our operations while ensuring sustainability. Some examples include procedure for proper management of waste generated by the operations, procedure for recycling of different type of waste, procedure for selection of equipment and material that are environmental friendly and procedure for energy and water conservation.<\/p>\n<p>In July 2021, a certification body was engaged by the company to conduct an external audit on the environmental management system implemented by Mirador building Contractor Pte Ltd in accordance with the requirements specify by the ISO 14001:2015 \u2013 Environmental Management Systems. The company managed to clear both the stage 1 and stage 2 external audits. In August 2021, Mirador Building Contractor Pte Ltd was certified with the ISO 14001:2015 accredited by the United Kingdom Accreditation Service (UKAS).<\/p>\n<p>Moving forward, the company will continue to review our existing processes and procedures, in line with the latest environmental regulations, guidelines and best practices. We will also adopt new technology whenever possible, in a bid to further reduce the impact on the environment from our business.<\/p>\n<p><img loading=\"lazy\" class=\"size-full wp-image-381 aligncenter\" src=\"https:\/\/miradorbcpl.com\/news\/wp-content\/uploads\/sites\/2\/2021\/11\/Certificarte1.jpg\" alt=\"\" width=\"383\" height=\"620\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISO 14001:2015 \u2013 Environmental Management Systems Certification Global environmental issues have always been one of the major concerns for mankind. Some of these environmental issues have worsened with time, and have shown great impact on human. Examples of some environmental issues include: \u2022\u00a0 Global warming; \u2022\u00a0 Air pollution; \u2022\u00a0 Water pollution; \u2022\u00a0 Unsustainable waste generation; [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":389,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/posts\/380"}],"collection":[{"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/comments?post=380"}],"version-history":[{"count":13,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/posts\/380\/revisions"}],"predecessor-version":[{"id":399,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/posts\/380\/revisions\/399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/media\/389"}],"wp:attachment":[{"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/media?parent=380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/categories?post=380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/miradorbcpl.com\/news\/wp-json\/wp\/v2\/tags?post=380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}